Mining Tailings Delivery Line Retrofit - Colorado

TDL1
TDL2
TDL3
TDL4
TDL5
previous arrow
next arrow

The existing supports for this reinforced concrete pipe were significantly corroded and required replacement. The 1,000 foot long TDL had to be 100% operational during throughout the entire project, and so we designed a retrofit structure that could be installed adjacent to the existing structure.