River Centre – Edwards, Colorado

RC1
RC2
RC3
RC4
RC5
previous arrow
next arrow

65,000 square foot mixed use building consisting of steel joists and braced steel frame.  The majority of the building was pre-fabricated offsite, to permit construction to proceed during winter months.  We coordinated directly with the steel fabricator and erector to sequence efficient installation of the superstructure.